Bioconductor 2.5 Release Schedule

September 25

R:

  • Start of the release cycle.

BioC:

  • Deadline for new package submissions for release with BioC 2.5.
  • All BioC package developers should start using R-devel pre-release for testing their packages.

September 28

R:

  • R Grand Feature Freeze (alpha).

October 7

BioC:

  • Release candidate of annotation packages built and posted to devel annotation data repository

October 9

BioC:

  • BioC Grand Feature Freeze (alpha): no new packages added to BioC release roster.

October 12

R:

  • R Feature Freeze (beta).

October 16

BioC::

  • BioC Feature Freeze (beta): no API changes to BioC.
  • Deadline for BioC packages passing R CMD build and check without error.

October 19

R::

  • R Code Freeze (release candidate).

October 23

R::

  • R Prerelease.

BioC::

  • BioC release candidate 1. Package maintainers should limit changes to "show-stopper" bugs and documentation improvements.
  • Deadline for packages passing R CMD build and check without warning. Some warnings will be accepted, clarification on the bioc-devel mailing list.
  • Annotation data packages finalized.

October 26

R::

  • R 2.10 Release.

October 27

BioC::

  • Creation of the BioC 2.5 release branch. Development can resume on trunk, but changes will not be part of the release.
  • Build final release repositories.
  • Test install scripts, GUI installation.

Octorber 28

BioC::

  • BioC 2.5 release.

External Resources

For more information on the release details for R 2.10.0, visit the R Developer Page.

BioC 2.5 Release Schedule (last edited 2009-09-25 16:37:08 by PatrickAboyoun)